Client name: Confidential
Name of the project: Construction of the Bellefontaine and Pointe Jarry power plants on behalf of EDF Production Electrique Insulaire

Description of project and customer issues

The company concerned is a German company specialising in the engineering and construction of industrial vehicles (trucks and buses), diesel engines and turbomachinery. In 2008, EDF PEI awarded a consortium a contract for the turnkey delivery of three thermal power plants with a unit capacity of 220 MW (Réunion, Martinique and Guadeloupe). The company concerned, acting as the leader of this consortium, entrusted Aegide International with a technical assistance mission for the projects in Martinique (Bellefontaine) and Guadeloupe (Pointe Jarry).

During the period February 2013-July 2015, Aegide International seconded one of its employees to successively ensure the HSE management of these 2 projects.

Activities / Tasks and Solutions developed by Aegide International

Manager HSE et interlocuteur HSE du groupement concerné vis-à-vis de la Direction de projet d’EDF PEI et des membres du groupement.

  • Guarantor of the risk management policy during the construction, pre-commissioning, commissioning and start-up phases of commercial engine operation
  • Deployment of HSE MS with monitoring & management of EDF contractual requirements
  • Risk analysis and definition of preventive measures Drafting of the Site Emergency Plan and updating of the Prevention Plans and the PPSPS
  • Documentary verification as part of the Intervention Request procedure, management of on-site coactivity and consignment requests (120 permits per day at peak activity)
  • Encadrement de superviseurs HSE et coordination des actions HSE pour le groupement (13 Superviseurs HSE et 2 infirmières en Martinique – 15 Superviseurs HSE et 1 infirmière en Guadeloupe).
  • HSE animation (customer HSE meeting, partner HSE meeting, Hierarchical Safety Visit, Behavioral Safety Visit, safety flash, information note on risks, treatment of malfunctions, co-facilitation of the CISSCT)
  • Implementation and monitoring of action plans
  • Steering and monitoring of indicators with reporting
  • Post-accident analyzes (ATSA, ATAA), near misses and dangerous situations

Share

See other case studies

en_GB

Information

Nos bureaux seront fermés du 14 au 17 mai 2026. Merci pour votre compréhension.

Would you like to be contacted to find out more about our services and products?

Let's talk about it