{"id":38437,"date":"2026-01-22T11:38:51","date_gmt":"2026-01-22T10:38:51","guid":{"rendered":"https:\/\/www.aegide-international.com\/?p=38437"},"modified":"2026-01-22T11:46:07","modified_gmt":"2026-01-22T10:46:07","slug":"realisation-dun-audit-qhse-a-lechelle-europeenne","status":"publish","type":"post","link":"https:\/\/www.aegide-international.com\/en_gb\/realisation-dun-audit-qhse-a-lechelle-europeenne\/","title":{"rendered":"Conducting a QHSE audit at European level"},"content":{"rendered":"<p style=\"font-style:normal;font-weight:400\"><strong>Client<\/strong> : confidential <br><strong>Business sector<\/strong> : Energy Infrastructure \/\/ Electric vehicle fast charging station<br><strong>Challenges<\/strong> : Evaluate and standardise the QSE approach<br><strong>Date<\/strong> : May to October 2025<br><strong>Location<\/strong> : France, Belgium and Germany <\/p>\n\n\n\n<div style=\"height:60px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h3 class=\"wp-block-heading has-luminous-vivid-orange-color has-text-color has-medium-font-size\" style=\"font-style:normal;font-weight:800\">Description of project and customer issues<\/h3>\n\n\n\n<p style=\"font-style:normal;font-weight:400\"><em>In a context of strong growth and international development, our client <em> An operator of fast charging points for electric vehicles, present in all large and medium-sized European cities<\/em>, wishes to structure and harmonise its practices by implementing a QSE management system.<\/em>. <\/p>\n\n\n\n<div class=\"wp-block-group\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<div class=\"wp-block-group\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<p style=\"font-style:normal;font-weight:400\">In 2023, an initial QSE assessment identified a reactive maturity level and a need for dedicated resources to structure the management system.<\/p>\n\n\n\n<p style=\"font-style:normal;font-weight:400\">In 2025, a second QSE audit was conducted in France, Belgium and Germany.<br>The main objectives were:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><em>Develop a coherent strategy and roadmap at European level.<\/em><\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li><em>Define a common QSE framework and standards,<\/em><\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Assess the maturity of the various sites.<\/li>\n<\/ul>\n<\/div><\/div>\n<\/div><\/div>\n\n\n\n<p style=\"font-style:normal;font-weight:400\"><em>Aegide International was commissioned to conduct an assessment based on a QSE framework, identify strengths and weaknesses, and develop guidelines to standardise local practices and ensure consistency throughout the stations' life cycle.<\/em><\/p>\n\n\n\n<p style=\"font-style:normal;font-weight:400\"><strong>The purpose of these audits was twofold:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li style=\"font-style:normal;font-weight:400\">Verify that new stations comply with current regulatory requirements.<\/li>\n\n\n\n<li style=\"font-style:normal;font-weight:400\">Measure the gap with the company's internal standards in order to identify areas for improvement and ensure harmonised and secure deployment of new installations.<\/li>\n<\/ul>\n\n\n\n<div style=\"height:60px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h3 class=\"wp-block-heading has-luminous-vivid-orange-color has-text-color has-medium-font-size\" style=\"font-style:normal;font-weight:800\">Activities \/ Tasks and Solutions developed by Aegide International<\/h3>\n\n\n\n<p style=\"font-style:normal;font-weight:400\">AEGIDE INTERNATIONAL supported the company in conducting audits of its CNG, LNG and CNG stations through several key actions:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li style=\"font-style:normal;font-weight:400\">Develop a QSE framework tailored to your organisation and aligned with ISO standards. <\/li>\n\n\n\n<li>Conduct site visits to assess the maturity level of three countries at different stages of the charging station life cycle: from construction to maintenance. <\/li>\n\n\n\n<li>Identify best practices to share and priority gaps to comply with ISO expectations. <\/li>\n\n\n\n<li>Facilitate workshops to establish the QSE strategy: Vision, Policy, Objectives, Action Plan. <\/li>\n\n\n\n<li>Write a QSE manual to document how the management system works, detailing roles and responsibilities, specific actions at each stage of a station's life cycle, and the improvement process. <\/li>\n<\/ul>\n\n\n\n<div style=\"height:60px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h3 class=\"wp-block-heading has-luminous-vivid-orange-color has-text-color has-medium-font-size\" style=\"font-style:normal;font-weight:800\">Results <\/h3>\n\n\n\n<p>The intervention provided a clear picture of the QHSE maturity level in the three countries, enabled the development of a harmonised strategy and the definition of a concrete action plan.<br>A bilingual QSE manual (English) was drafted to accompany the rollout of the management system. The assignment lasted a total of 29 days.<\/p>\n\n\n\n<div style=\"height:30px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button is-style-outline is-style-outline--1\"><a class=\"wp-block-button__link has-luminous-vivid-amber-color has-white-background-color has-text-color has-background has-link-color has-medium-font-size has-custom-font-size wp-element-button\" href=\"https:\/\/www.aegide-international.com\/en_gb\/audits-hse\/\" style=\"border-radius:11px;font-style:normal;font-weight:400\"><strong>Our HSE Audit services<\/strong><\/a><\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Audits on its CNG, LNG and CNG stations as part of the development of its business.<\/p>","protected":false},"author":4,"featured_media":38564,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[28,12],"tags":[],"class_list":["post-38437","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-audit-hse","category-case-studies"],"jetpack_featured_media_url":"https:\/\/www.aegide-international.com\/wp-content\/uploads\/2025\/12\/AdobeStock_1580330471-scaled.jpeg","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/www.aegide-international.com\/en_gb\/wp-json\/wp\/v2\/posts\/38437","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.aegide-international.com\/en_gb\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.aegide-international.com\/en_gb\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.aegide-international.com\/en_gb\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.aegide-international.com\/en_gb\/wp-json\/wp\/v2\/comments?post=38437"}],"version-history":[{"count":6,"href":"https:\/\/www.aegide-international.com\/en_gb\/wp-json\/wp\/v2\/posts\/38437\/revisions"}],"predecessor-version":[{"id":38643,"href":"https:\/\/www.aegide-international.com\/en_gb\/wp-json\/wp\/v2\/posts\/38437\/revisions\/38643"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.aegide-international.com\/en_gb\/wp-json\/wp\/v2\/media\/38564"}],"wp:attachment":[{"href":"https:\/\/www.aegide-international.com\/en_gb\/wp-json\/wp\/v2\/media?parent=38437"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.aegide-international.com\/en_gb\/wp-json\/wp\/v2\/categories?post=38437"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.aegide-international.com\/en_gb\/wp-json\/wp\/v2\/tags?post=38437"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}