{"id":38372,"date":"2025-10-14T14:28:15","date_gmt":"2025-10-14T12:28:15","guid":{"rendered":"https:\/\/www.aegide-international.com\/?p=38372"},"modified":"2025-10-14T14:38:22","modified_gmt":"2025-10-14T12:38:22","slug":"audits-de-stations-gnv-gnl-et-gnc","status":"publish","type":"post","link":"https:\/\/www.aegide-international.com\/en_gb\/audits-de-stations-gnv-gnl-et-gnc\/","title":{"rendered":"Audits de stations GNV \/ GNL et GNC"},"content":{"rendered":"<p class=\"wp-block-paragraph\" style=\"font-style:normal;font-weight:400\"><strong>Client name<\/strong> : Confidential <br><strong>Name of the project<\/strong>&nbsp;:&nbsp;Audits de stations<\/p>\n\n\n\n<h3 class=\"wp-block-heading has-luminous-vivid-orange-color has-text-color has-medium-font-size\" style=\"font-style:normal;font-weight:800\">Description of project and customer issues<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\" style=\"font-style:normal;font-weight:400\">Une entreprise sp\u00e9cialis\u00e9e dans les solutions \u00e9nerg\u00e9tiques et carburants a sollicit\u00e9 AEGIDE INTERNATIONAL pour r\u00e9aliser des audits sur ses stations GNV, GNL et GNC dans le cadre du d\u00e9veloppement de son activit\u00e9.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\" style=\"font-style:normal;font-weight:400\"><strong>The purpose of these audits was twofold:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li style=\"font-style:normal;font-weight:400\">Verify that new stations comply with current regulatory requirements.<\/li>\n\n\n\n<li style=\"font-style:normal;font-weight:400\">Measure the gap with the company's internal standards in order to identify areas for improvement and ensure harmonised and secure deployment of new installations.<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading has-luminous-vivid-orange-color has-text-color has-medium-font-size\" style=\"font-style:normal;font-weight:800\">Activities \/ Tasks and Solutions developed by Aegide International<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\" style=\"font-style:normal;font-weight:400\">AEGIDE INTERNATIONAL supported the company in conducting audits of its CNG, LNG and CNG stations through several key actions:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li style=\"font-style:normal;font-weight:400\"><strong>Analyse documentaire r\u00e9glementaire<\/strong> : \u00c9tude de la documentation relative au code du travail et aux installations class\u00e9es (ICPE).<\/li>\n\n\n\n<li style=\"font-style:normal;font-weight:400\"><strong>Analyse documentaire technique<\/strong> : Revue des sch\u00e9mas PID, PFD, zonage ATEX et autres documents techniques li\u00e9s aux installations.<\/li>\n\n\n\n<li style=\"font-style:normal;font-weight:400\"><strong>Cr\u00e9ation d\u2019un r\u00e9f\u00e9rentiel d\u2019audit <\/strong>: \u00c9laboration d\u2019un r\u00e9f\u00e9rentiel bas\u00e9 sur la norme europ\u00e9enne EN ISO 16924:2018.<\/li>\n\n\n\n<li style=\"font-style:normal;font-weight:400\"><strong>\u00c9valuation du syst\u00e8me de gestion de la s\u00e9curit\u00e9 existant <\/strong>: Identification des forces et des axes d\u2019am\u00e9lioration.<\/li>\n\n\n\n<li style=\"font-style:normal;font-weight:400\"><strong>R\u00e9daction d\u2019un rapport exhaustif d\u2019audit<\/strong> : Pr\u00e9sentation des constats et recommandations op\u00e9rationnelles et syst\u00e9miques.<\/li>\n\n\n\n<li style=\"font-style:normal;font-weight:400\"><strong>Conseil et accompagnement<\/strong> : Recommandations pour les principales am\u00e9liorations et soutien expert dans la mise en \u0153uvre du plan d\u2019actions op\u00e9rationnel.<\/li>\n\n\n\n<li style=\"font-style:normal;font-weight:400\"><strong>D\u00e9veloppement et diffusion des bonnes pratiques s\u00e9curit\u00e9<\/strong> : Sensibilisation et mobilisation des \u00e9quipes pour ancrer les standards HSE sur le terrain.<\/li>\n<\/ul>\n\n\n\n<div style=\"height:18px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"wp-block-paragraph\">Cette approche int\u00e9gr\u00e9e a permis de garantir la conformit\u00e9 r\u00e9glementaire, d\u2019optimiser le syst\u00e8me de gestion de la s\u00e9curit\u00e9 et de pr\u00e9parer les \u00e9quipes \u00e0 un d\u00e9ploiement s\u00e9curis\u00e9 et harmonis\u00e9 des nouvelles stations.<\/p>\n\n\n\n<div style=\"height:31px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-buttons is-layout-flex wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button is-style-outline is-style-outline--1\"><a class=\"wp-block-button__link has-luminous-vivid-amber-color has-white-background-color has-text-color has-background has-link-color has-medium-font-size has-custom-font-size wp-element-button\" href=\"https:\/\/www.aegide-international.com\/en_gb\/audits-hse\/\" style=\"border-radius:11px;font-style:normal;font-weight:400\"><strong>Our HSE Audit services<\/strong><\/a><\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Audits on its CNG, LNG and CNG stations as part of the development of its business.<\/p>","protected":false},"author":2,"featured_media":38373,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[28,12],"tags":[],"class_list":["post-38372","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-audit-hse","category-case-studies"],"jetpack_featured_media_url":"https:\/\/www.aegide-international.com\/wp-content\/uploads\/2025\/10\/392.jpg","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/www.aegide-international.com\/en_gb\/wp-json\/wp\/v2\/posts\/38372","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.aegide-international.com\/en_gb\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.aegide-international.com\/en_gb\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.aegide-international.com\/en_gb\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.aegide-international.com\/en_gb\/wp-json\/wp\/v2\/comments?post=38372"}],"version-history":[{"count":4,"href":"https:\/\/www.aegide-international.com\/en_gb\/wp-json\/wp\/v2\/posts\/38372\/revisions"}],"predecessor-version":[{"id":38434,"href":"https:\/\/www.aegide-international.com\/en_gb\/wp-json\/wp\/v2\/posts\/38372\/revisions\/38434"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.aegide-international.com\/en_gb\/wp-json\/wp\/v2\/media\/38373"}],"wp:attachment":[{"href":"https:\/\/www.aegide-international.com\/en_gb\/wp-json\/wp\/v2\/media?parent=38372"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.aegide-international.com\/en_gb\/wp-json\/wp\/v2\/categories?post=38372"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.aegide-international.com\/en_gb\/wp-json\/wp\/v2\/tags?post=38372"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}