{"id":37811,"date":"2025-05-12T11:21:03","date_gmt":"2025-05-12T09:21:03","guid":{"rendered":"https:\/\/www.aegide-international.com\/?p=37811"},"modified":"2025-09-29T11:05:14","modified_gmt":"2025-09-29T09:05:14","slug":"noip-securite-routiere","status":"publish","type":"post","link":"https:\/\/www.aegide-international.com\/en_gb\/noip-securite-routiere\/","title":{"rendered":"NOIP \u2013 Road safety"},"content":{"rendered":"<p>Client name: NOIP \u2013 New Owendo International Port<br>Project name: Road Safety Management System<\/p>\n\n\n\n<h2 class=\"wp-block-heading has-luminous-vivid-orange-color has-text-color has-medium-font-size\" style=\"font-style:normal;font-weight:800\">Description of project and customer issues<\/h2>\n\n\n\n<p>Located in the port area of Owendo, the New International Port of Owendo (NOIP) is a port infrastructure serving industry and trade in Gabon.<\/p>\n\n\n\n<p>A subsidiary of the Arise Ports &amp; Logistics group, this port terminal is equipped to handle the entire logistics chain for a wide range of cargo, from ship to industry, thanks to modern equipment and its own logistics fleet.<\/p>\n\n\n\n<p>Aegide International was commissioned by the NOIP in October 2022 to conduct a diagnostic assessment of its road safety performance and implement a road safety management strategy.<\/p>\n\n\n\n<p>In response to the findings of the assessment, Aegide International was engaged to assist NOIP in developing and implementing a risk-based approach to road safety. This is a first step in developing a strong safety culture that will protect NOIP's staff, customers, assets and global operations.<\/p>\n\n\n\n<h2 class=\"wp-block-heading has-luminous-vivid-orange-color has-text-color has-medium-font-size\" style=\"font-style:normal;font-weight:800\">Project objective<\/h2>\n\n\n\n<p>The main objective of this project was to support NOIP in implementing a road safety management system (RSMS) that would align the company with the certification requirements of ISO 39001.<\/p>\n\n\n\n<h2 class=\"wp-block-heading has-luminous-vivid-orange-color has-text-color has-medium-font-size\" style=\"font-style:normal;font-weight:800\">Scope of the project<\/h2>\n\n\n\n<p>The execution of the project took place in three stages according to the following approach:\u200b<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Gap analysis: <\/strong>evaluation of skills, examination of documents, interviews, observation in the field\u200b<\/li>\n\n\n\n<li><strong>Capacity\/skills strengthening:<\/strong>\n<ul class=\"wp-block-list\">\n<li>Training \/ awareness of the ISO 39001 standard requirements \"Road safety management systems\" (12 people)\u200b<\/li>\n\n\n\n<li>Training session of trainers - VL \/ PL \/ 4X4 (7 people trained)<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li><strong>Development of a Road Safety Management System:<\/strong>\n<ul class=\"wp-block-list\">\n<li>Animation of collective workshops around the following themes: SWOT; Vision ; Risk mapping; Stakeholder cartography \u200b<\/li>\n\n\n\n<li>Establishment of a strategic vision (road safety vision, road safety policy, safety objectives, key performance indicators) \u200b<\/li>\n\n\n\n<li>Implementation of an organization (organization chart, roles and responsibilities, action plan, resources, monitoring and evaluation)<\/li>\n\n\n\n<li>Establishment of an operational road safety dashboard.<\/li>\n<\/ul>\n<\/li>\n<\/ul>","protected":false},"excerpt":{"rendered":"<p>Technical advice to improve the management of road safety risks in the workplace.<\/p>","protected":false},"author":2,"featured_media":37814,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[12,29],"tags":[],"class_list":["post-37811","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-case-studies","category-conseil-hse"],"jetpack_featured_media_url":"https:\/\/www.aegide-international.com\/wp-content\/uploads\/2025\/05\/NOIP.jpg","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/www.aegide-international.com\/en_gb\/wp-json\/wp\/v2\/posts\/37811","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.aegide-international.com\/en_gb\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.aegide-international.com\/en_gb\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.aegide-international.com\/en_gb\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.aegide-international.com\/en_gb\/wp-json\/wp\/v2\/comments?post=37811"}],"version-history":[{"count":2,"href":"https:\/\/www.aegide-international.com\/en_gb\/wp-json\/wp\/v2\/posts\/37811\/revisions"}],"predecessor-version":[{"id":37813,"href":"https:\/\/www.aegide-international.com\/en_gb\/wp-json\/wp\/v2\/posts\/37811\/revisions\/37813"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.aegide-international.com\/en_gb\/wp-json\/wp\/v2\/media\/37814"}],"wp:attachment":[{"href":"https:\/\/www.aegide-international.com\/en_gb\/wp-json\/wp\/v2\/media?parent=37811"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.aegide-international.com\/en_gb\/wp-json\/wp\/v2\/categories?post=37811"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.aegide-international.com\/en_gb\/wp-json\/wp\/v2\/tags?post=37811"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}