{"id":31290,"date":"2023-03-10T11:33:14","date_gmt":"2023-03-10T10:33:14","guid":{"rendered":"http:\/\/www.aegide-international.com\/?p=31290"},"modified":"2024-05-29T11:53:50","modified_gmt":"2024-05-29T09:53:50","slug":"man-assistance-technique","status":"publish","type":"post","link":"https:\/\/www.aegide-international.com\/en_gb\/man-assistance-technique\/","title":{"rendered":"Assistance Technique"},"content":{"rendered":"<p class=\"wp-block-paragraph\">Client name: Confidential<br>Name of the project: Construction of the Bellefontaine and Pointe Jarry power plants on behalf of EDF Production Electrique Insulaire<\/p>\n\n\n\n<h2 class=\"wp-block-heading has-luminous-vivid-orange-color has-text-color has-medium-font-size\" style=\"font-style:normal;font-weight:800\">Description of project and customer issues<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The company concerned is a German company specialising in the engineering and construction of industrial vehicles (trucks and buses), diesel engines and turbomachinery. In 2008, EDF PEI awarded a consortium a contract for the turnkey delivery of three thermal power plants with a unit capacity of 220 MW (R\u00e9union, Martinique and Guadeloupe). The company concerned, acting as the leader of this consortium, entrusted Aegide International with a technical assistance mission for the projects in Martinique (Bellefontaine) and Guadeloupe (Pointe Jarry).<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">During the period February 2013-July 2015, Aegide International seconded one of its employees to successively ensure the HSE management of these 2 projects.<br><\/p>\n\n\n\n<h2 class=\"wp-block-heading has-luminous-vivid-orange-color has-text-color has-medium-font-size\" style=\"font-style:normal;font-weight:800\">Activities \/ Tasks and Solutions developed by Aegide International<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\" style=\"font-style:normal;font-weight:700\">Manager HSE et interlocuteur HSE du groupement concern\u00e9 vis-\u00e0-vis de la Direction de projet d\u2019EDF PEI et des membres du groupement.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Guarantor of the risk management policy during the construction, pre-commissioning, commissioning and start-up phases of commercial engine operation <\/li>\n\n\n\n<li>Deployment of HSE MS with monitoring &amp; management of EDF contractual requirements <\/li>\n\n\n\n<li>Risk analysis and definition of preventive measures\nDrafting of the Site Emergency Plan and updating of the Prevention Plans and the PPSPS<\/li>\n\n\n\n<li>Documentary verification as part of the Intervention Request procedure, management of on-site coactivity and consignment requests (120 permits per day at peak activity) <\/li>\n\n\n\n<li>Encadrement de superviseurs HSE et coordination des actions HSE pour le groupement (13 Superviseurs HSE et 2 infirmi\u00e8res en Martinique &#8211; 15 Superviseurs HSE et 1 infirmi\u00e8re en Guadeloupe).<\/li>\n\n\n\n<li>HSE animation (customer HSE meeting, partner HSE meeting, Hierarchical Safety Visit, Behavioral Safety Visit, safety flash, information note on risks, treatment of malfunctions, co-facilitation of the CISSCT) <\/li>\n\n\n\n<li>Implementation and monitoring of action plans <\/li>\n\n\n\n<li>Steering and monitoring of indicators with reporting <\/li>\n\n\n\n<li>Post-accident analyzes (ATSA, ATAA), near misses and dangerous situations<\/li>\n<\/ul>","protected":false},"excerpt":{"rendered":"<p>Aegide International seconded one of its employees to successively manage 2 HSE projects.<\/p>","protected":false},"author":2,"featured_media":31293,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[12,29],"tags":[],"class_list":["post-31290","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-case-studies","category-conseil-hse"],"jetpack_featured_media_url":"https:\/\/www.aegide-international.com\/wp-content\/uploads\/2023\/03\/man_1.jpg","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/www.aegide-international.com\/en_gb\/wp-json\/wp\/v2\/posts\/31290","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.aegide-international.com\/en_gb\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.aegide-international.com\/en_gb\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.aegide-international.com\/en_gb\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.aegide-international.com\/en_gb\/wp-json\/wp\/v2\/comments?post=31290"}],"version-history":[{"count":7,"href":"https:\/\/www.aegide-international.com\/en_gb\/wp-json\/wp\/v2\/posts\/31290\/revisions"}],"predecessor-version":[{"id":36859,"href":"https:\/\/www.aegide-international.com\/en_gb\/wp-json\/wp\/v2\/posts\/31290\/revisions\/36859"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.aegide-international.com\/en_gb\/wp-json\/wp\/v2\/media\/31293"}],"wp:attachment":[{"href":"https:\/\/www.aegide-international.com\/en_gb\/wp-json\/wp\/v2\/media?parent=31290"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.aegide-international.com\/en_gb\/wp-json\/wp\/v2\/categories?post=31290"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.aegide-international.com\/en_gb\/wp-json\/wp\/v2\/tags?post=31290"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}